Customization: | Available |
---|---|
After-sales Service: | Online Service Support |
Warranty: | One Year |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description
|
XJ250 Workover Rig (Overhaul)
|
XJ250 Workover Rig (Servicing)
|
Workover Depth
|
3,200m(10,500ft, 2-7/8'' DP)
|
2,000m(6,560ft, 2-7/8'' DP)
|
Servicing Depth
|
3200m (10,500ft, 2-7/8''EUE Tubing)
|
|
Rated Hook Load
|
400kN (90,000 lbf)
|
|
Max. Hook Load
|
735kN (165,000 lbf )
|
675kN (151,700 lbf)
|
Traveling System
|
3×4 {Φ22mm (7/8'') Wireline)
|
|
Hook Hoisting Speed
|
1.5m/s (4.92ft/s)
|
|
Overall Dimensions(l×w×h)
|
18.5×2.9×4.2m60.7×9.5×13.8ft
|
16.5×2.9×4.2m54.1×9.5×13.8ft
|
Weight
|
50,000kg (110,230 lb)
|
45,000kg (99,200lb)
|
Max. Travel Speed
|
60km/h (37mph), but limit 45km/h(28mph)
|
|
Carrier
|
Self-propeller 10×8
|
Self-propeller 6×4
|
Engine Model and Rated Power
|
C9/ATAAC260kW(350hp/2100rpm)
|
|
Transmission
|
Allison 4700 OFS
|
|
Height
|
31m (102ft)
|
27m (89ft)
|
Max. Static Hook Load
|
735kN (165,000 lbf)
|
675kN (151,700 lbf)
|
Racking Board Capacity
|
3200m (10,500 ft, 2-7/8'' EUE TB)
|
|
Racking Board Height
|
20.1m (66 ft)
|
16.8m (55ft)
|
Drawwork Rated Power
|
185kW (250hp, Double drum)
|
|
Main Drum
|
Φ336×828mm (Φ13.2'' ×32.6'')
|
|
Max. Faster Line Pull
|
145kN (32,600 lbf)
|
|
Sanding Drum
|
Φ315 mm×908mm (Φ12.4'' ×35.7'')
|
|
Air Assist Brake System
|
KOBELT Disc 4-7-35'' Caliper 5026-CM
|
|
Drill Floor (l×w×h)
|
4.2×4.2×3.3m (13.8×13.8×10.8 ft)
|
|
Swivel Model and Max. Load
|
SL90 900kN (202,330 lbf)
|
|
ZP125 Rotary Table
|
Max. Load 900kN (202,330 lbf) Max. Open Dia. 292mm (11.5'')
|
1.Designed with a drilling company, first of its kind in China.
XJ250 Workover Rig
XJ250 workover rig is one of light-duty self-propelled rig, and mainly used for shallow well workover , oil testing, fishing and pump check operations. It is equipped with a lifting system,single drum drawworks, hydraulically raised double or single mast and famous engine and ALLISON hydromechanical transmission. It is easy for transportation and convenient for installation, operation and maintenance.
1. 68.90 ft ( 21m ) double section mastor 59.06 ft ( 18m ) single section mast.
2. 6×6 full drive chassis, fast movement, good cross-country capability.
3. Double drum drawworks, band brake,without auxiliary brake.
4. Mast base and simple operation platform are hanged on the rear.
5. Rotary driving system can be equipped.
Hebei Xinhuafa Petroleum Machinery Co, Ltd. is a specialized manufacturer that
focus on the manufacturing of oil drilling equipment and spare parts since 2006. Our main products are mud pump and accessories which can be interchangeable with many mud pump of oversea and domestic brand,including BOMCO F series, HHF series, NOV P series,LANSHI 3NB series, Oingzhou 3NB series and other mud pump. The products we supply are the cylinder liner, piston,valve(full open type and web type), piston rod, extension rod, cross head, bearing,v belt ,safety valve,manifold,sealing and other mud pump accessories.1,Q. How long for your delivery time?