Customization: | Available |
---|---|
After-sales Service: | 1 Year |
Warranty: | 1 Year |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Description:
Milling shoes can be divided into three kind: flat-bottom (or concave-bottom) milling shoe, guide mill shoe and come mill shoe according to its structure and shape At the milling surface, the carbide particles are built up by welding, which plays a part of self-milling. It is used to mill the fallen substances, such as bolt, nut, tooth wheel, slip dog, fittings for deep-well pump, etc.
1. Designed and manufactured according to API spec 7-1.
2. It can complete casing window cutting and window repair operations once with regular and smooth window.
3. Milling shoe can be divided into three kind: flat-bottom (or concave-bottom) milling shoe, guide mill shoe.
4. It is used to mill the fallen substances, such as bolt, nut, tooth wheel, slip dog, fittings for
Type | O.D./in | Connetion API |
OAL/in |
MX105 | 4-1/8 | NC23 | 3-1/2 |
MX114 | 4-1/2 | NC26 | 16 |
MX140 | 5-1/2 | 3-1/2REG | 27-1/2 |
MX152 | 6 | NC38 | 18-1/2 |
MX178 | 7 | NC46 | 19 |
MX195 | 7-43/64 | 4-1/2REG | 21-1/4 |
MX215 | 8-15/32 | 4-1/2REG | 21-1/4 |
MX311 | 12-1/4 | 6-5/8REG | 23-27/64 |
MX406 | 16 | 7-5/8REG | 25-19/32 |
1) How can I place order?
A: You can contact us by email about your order details, or place order on line.
2) How can I pay you?
A: After you confirm our PI, we will request you to pay. T/T and Western Union are the most usual ways we are using.
3) What's the order procedure?
A: First we discuss order details, production details by email or TM. Then we issue you an PI for your confirmation. You will be requested to do pr -epaid full payment or deposit before we go into production. After we get the deposit, we start to process the order. We usually need 15-25days if we don't have the items in stock. Before production has been finished, we will contact you for shipment details, and the balance payment. After payment has been settled, we start to prepare the shipment for you.
4)How do you take care when your clients received defective products?
A: replacement. If there are some defective items, we usually credit to our customer or replace in next shipment.
5)How do you check all the goods in the production line?
A: We have spot inspection and finished product inspection. We check the goods when they go into next step production procedure.